Coconut Project - Specification

 
  • STRUCTURAL : Earthquake resistant Isoleted R.C.C. design
  • PEST CONTROL : Anti-termite treatment
  • PLUMBING : U.P.V.C. Pipe & Fittings
  • POWER SUPPLY : Individual Single Phase meter in all units
  • ELEVATORS : Full Automatic

INTERNAL UNIT FINISHES

  • FLOORING : Vitrified tiles of 2'-0 * 2'-0 in shops, offices at all floor levels
  • TOILET : Granito tiles in floor & dado. All sanitary fitting of Cera or equivalent C.P. fitting Jaquar make or equivalent brands
  • ELECTRIFICATION : Concealed wiring with Standard accessories & ISI Wire
  • SWITCHES : Modular switches with I.S.I. mark in all units.
  • SHUTTER : Good quality G.I. handle operated rolling shutter on ground & first floor
  • PLASTER : Internal double coat mala plaster with wall care putty finish

EXTERNAL BUILDING FINISHES

  • PLASTER : External double coat plaster
  • PAINT : Whether shield texture finish

INTERNAL COMMON AREA FINISHES

  • LIFT CLADDING : Granite wall cladding in each floor near passenger lift entrance
  • STAIRCASE : Granite flooring
  • PASSAGE : Vitrified tile flooring

EXTERNAL OPEN GROUND AREA FINISHES

  • PARKING AT GROUND : Parking finished with V.D.S. (Tri mix rough finish)/paver of good quality
  • PARKING AT BASEMENT : Parking finished with V.D.S (Tri mix rough finish)